Welded to the end of the pipe or fitted to the outer thread of the end of the pipe to seal the pipe
Brand YSDLGJ
Certification
Lead Time 30days
Guarantee Period 12months
Source of Supply Hebei
Payment Method T/T L/C
Recommendations
Packing, P/N: SZB-8-12 | HV240/HV1200 Degaser
BrandTSC
28"NPS 90°Elbow
BrandYSDLGJ
HG20613-40Cr Full Thread Stud-blackened
BrandTB
Nominal Pressure Level Cast Steel Gate Valve
BrandCD
Makeup and Breakout Tools | Manual Tong Type HT55 W/LG. Lever|3-1/2"~13-3/8"|55000 Ft.Lbs
BrandRUTONG
Petroleum Products Condensation Point and Pour Point Measuring Equipment
BrandERUI
Professonal Patchet(Ratchet Wrench)
BrandENDURA
4pcs. Pliers Tool Kit
BrandENDURA
Nominal Pressure Level Cast Steel Gate Valve
BrandCD
4"NPS 45°Elbow
BrandYSDLGJ
10pcs. Comb. Wrench Set
BrandENDURA
Mud Pump|RS-F1600FTL
BrandHRSB
Makeup and Breakout Tools | Manual Tong Type SDD|4"~17"|135kN.m
BrandRUTONG
DZ3600 Carbon Black Dispersity Detector
BrandERUI
KGS0015 High Visibility Rain Suit
BrandKANGSHIELD
Pony Rod
BrandJITONG
NPS10 CL300 Blind Flange
BrandRUNYANG
4"NPS 90°Elbow
BrandYSDLGJ