107.37.01.22 Gasket
Brand LS
Certification
Lead Time 15days
Guarantee Period 12months
Source of Supply Gansu
Payment Method T/T L/C
1. LS Group, founded in 1953, was merged by two projects among 156 national key construction projects during "the First Five-Year Plan". It is the only large leading group integrating the development, design and manufacturing of high-end energy equipment including: oil drilling, oil refining and chemical engineering, heat exchange, new energy and general machinery, and advanced new materials for hot working. The Group was the earliest, largest and strongest enterprise in this field, boasting 60-year splendid history. 2. The Group provides a great variety of petroleum machinery parts and tools of LS (lsnov, ls, lspe) brands which are all original quality goods.
Technical Parameters:
1. Part No. (Drawing No.): 107.37.01.22
Recommendations
Shaft, P/N: TS-20612-02-33-S | HCP/HCP-S Series Pump Parts
BrandTSC
7pcs. Insulated Screwdriver
BrandENDURA
FP Inside BOP Valve│ Standard Service
BrandSHUANGJIA
12.5mm Torque Wrench
BrandENDURA
Bolt, P/N: 1198267 |MP-5
BrandKERUI
Crude Oil Buffer Tank
BrandERUI
Baffle Plate, P/N: RS11306.05.012 | RSF-800/1000
BrandKERUI
Mica Heater/Tips
BrandENDURA
Wear-proof disk| LGF-1300 / LGF-1600
BrandKERUI
6.3mm Insulated Screwdriver
BrandENDURA
Metering Tank
BrandERUI
JTB Series Drive Sub
BrandSHUANGJIA
VDE Insulated Ratcheting Cable Cutters
BrandENDURA
Bolt, Impeller Lock, P/N: TS-7415648 | HSP Shear Pump Parts
BrandTSC
Bonded V-Belt, 4ZV25J, 5ZV25J | For Mud Pump Drive
BrandXLFT
Power Tong Accessories | Die, P/N: 01.01-27MG | ZQ203-100
BrandRUSHI
Nozzle, 50mm | HJM200 Mud Hopper
BrandTSC
Pen Light With 2AA
BrandENDURA