Welded to the end of the pipe or fitted to the outer thread of the end of the pipe to seal the pipe
Brand YSDLGJ
Certification
Lead Time 30days
Guarantee Period 12months
Source of Supply Hebei
Payment Method T/T L/C
Welded to the end of the pipe or fitted to the outer thread of the end of the pipe to seal the pipe.
Recommendations
Power Tong Accessories | Quick Release Valve, P/N: QF514C | ZQ203-100
BrandRUSHI
Cover, Inboard Bearing, P/N: TS-20626 | HCP/HCP-S Series Pump Parts
BrandTSC
Power Tong Accessories | Planet Gear Shaft, P/N: 56.330.04 | TQ340-35
BrandRUSHI
Metering Tank
BrandERUI
Bearing Cover, P/N: TS-20619-01, TS-20619-02 | HCP/HCP-S Series Pump Parts
BrandTSC
Wash Pipe, P/N: 71.130.00|DSL-110
BrandRUSHI
Bearing 6217, P/N: W21106217| LW450×1000-N
BrandXBSY
Wear-proof disk| LGF-1300 / LGF-1600
BrandKERUI
JQ-YS Double Way Hydraulic Shock Absorber
BrandSHUANGJIA
Upper Guide Plate, P/N: AH1001010402, AH33001-04.02 | BOMCO F-1000
BrandKERUI
Air Clutch, P/N: RS76.210.00 | XSL225.2C
BrandRUSHI
Gear Oil Pump, P/N:AH050102060701, AH050101060601 | BOMCO F-500
BrandKERUI
Crosshead Pin, P/N: RS11309.04.011 | RS F-1300/RS F-1600
BrandKERUI
JTB Series Drive Sub
BrandSHUANGJIA
VDE Insulated Lineman's Plier
BrandENDURA
7pcs. Insulated Screwdriver
BrandENDURA
11pcs. VDE Insulated Tools Set
BrandENDURA
Trailer and Semi-Trailer Mechanical Suspension
BrandDERUILONG