3000PSI EE Tubing Head Housing
Brand LIWEN
Certification
Lead Time 90days
Guarantee Period 12months
Source of Supply Jiangsu
Payment Method T/T L/C
Function and use:
1. The tubing head housing is mainly composed of the tubing head body, tubing hanger, side outlet valve, sealing ring and other parts. The structure can be selected according to the needs of single wing, double wing structure.
2. Hangers generally choose single tube, double tube and other structural forms.
3. Plate valve can choose PFF, FC, FL, FLS and other structural forms.
4. All pressure gauges are aseismic.
Recommendations
JTB Series Drive Sub
BrandSHUANGJIA
Air Clutch, P/N: RS76.210.00 | XSL225.2C
BrandRUSHI
Bonded V-Belt, 4ZV25J, 5ZV25J | For Mud Pump Drive
BrandXLFT
VDE Insulated Lineman's Plier
BrandENDURA
Shaft, P/N: TS-20612-02-33-S | HCP/HCP-S Series Pump Parts
BrandTSC
Wear-proof disk| LGF-1300 / LGF-1600
BrandKERUI
6.3mm Insulated Screwdriver
BrandENDURA
VDE Insulated Ratcheting Cable Cutters
BrandENDURA
12.5mm Torque Wrench
BrandENDURA
Power Tong Accessories | Die, P/N: 01.01-27MG | ZQ203-100
BrandRUSHI
1/4" Dr.VDE Insulated Socket
BrandENDURA
VDE Insulated Cable Cutters
BrandENDURA
Power Tong Accessories | Stop Ring, 15, 20, 85, GB894.1-86 | TQ340-35
BrandRUSHI
Crosshead Pin, P/N: RS11309.04.011 | RS F-1300/RS F-1600
BrandKERUI
Rechargeable Flashlight
BrandENDURA
16pcs. VDE Insulated Tools Set
BrandENDURA
Central Pipe, P/N: RS78.100-12A | SL450
BrandRUSHI
Steel Car Seat 440x360x365mm
BrandENDURA