Welded to the end of the pipe or fitted to the outer thread of the end of the pipe to seal the pipe
Brand YSDLGJ
Certification
Lead Time 30days
Guarantee Period 12months
Source of Supply Hebei
Payment Method T/T L/C
Welded to the end of the pipe or fitted to the outer thread of the end of the pipe to seal the pipe.
Recommendations
C-320D-213-86Pumping Unit
BrandZYZJ
Tubing
BrandXINBAOYI
Pumping Unit
BrandHENGTAIFENG
Pumping Unit
BrandZYZJ
Extra Long Ball Point Hex Key
BrandENDURA
20pcs. 1/2" Dr. Socket Set
BrandENDURA
CYJY14-4.8-73HF/C Pumping Unit
BrandZYZJ
KV010404 Latex Dipped Gloves
BrandKANGSHIELD
42.16mm J55 Tubing
BrandXINBAOYI
38pcs. 1/4" Dr.Socket Set
BrandENDURA
23-Leaf Feeler Gauge
BrandSHEFFIELD
2000PSI AA Tubing Head Housing
BrandLIWEN
150 Pc Tool Set
BrandSHEFFIELD
NPS1 1/2 CL300 Flat Welding Flange
BrandYSDLGJ
KH010201 Breathable Helmet
BrandKANGSHIELD
DIN929-A4-80 Hex Weld Nut M12-M16
BrandSDTD
9pcs. Long Ball Point Hex Key Set
BrandENDURA
2000PSI DD Tubing Head Housing
BrandLIWEN