Brand ERUI
Certification
Lead Time 60days
Guarantee Period 12months
Source of Supply Shandong
Payment Method T/T L/C
product description:
The device is composed of the process flow, automatic control system, instruments and valves of multiple water injection wells in a high-strength skid-mounted steel room. A set of skid-mounted room can automatically and stably inject water for 3-10 water injection wells according to the set flow rate. We can also customize products for users according to their special requirements.
By setting the foundation on site, connecting high-pressure water supply and single-well pipelines, and external power supply, you can quickly build a water distribution station, which can greatly reduce the construction of the site and the installation process of pipelines, speed up the station construction cycle, equipment can be relocated and reused with High cost performance.
Drainage ditch, indoor ventilation and lighting system are designed inside the skid-mounted room, and a high-performance ZK-02T terminal control system is equipped, which can realize the remote transmission and monitoring of operating status and data, and realize unattended, remote automatic control, and in emergency circumstances, the control valve can be shut off remotely.
working principle:
After centralized combination of single wells, the water distribution skid-mounted module is used for steady flow and water distribution measurement. The incoming water passes through the upstream cut-off valve and flow meter of the pipeline, and then is automatically regulated by the flow controller, and then the pressure and flow information is transmitted to the monitoring center through the PLC information collection box.
product advantages:
1.Speed up the station construction cycle and save manpower and material resources;
2. The equipment can be relocated and reused, saving costs;
3. It can realize the remote transmission and monitoring of running status and data, and realize unattended operation.
4. Remote automatic control can be used to shut off the regulating valve in case of emergency.
technical parameter:
specification | WLPS-5-F\40 | WLPS-7-F\25 | WLPS-10-F\25 |
Working pressure,Mpa | 40 | 25 | 25 |
Single well water distribution flow,(m³/h) | 0.5~10 | 0.5~10 | 0.5~10 |
Distribution power,Kw | 0.5 | 0.5 | 0.5 |
Manifold diameter,mm | 114~150 | 114~168 | 150~219 |
quality,t | 4.3 | 5.6 | 7.5 |
size,m | 5*3*3 | 6*3*3 | 8*3*3 |
Control System | ZK-01T-5 | ZK-01T-7 | ZK-01T-10 |
Recommendations
C-640D-305-192Pumping Unit
BrandZYZJ
Mud Pump|RS-F800
BrandHRSB
KGS0015 High Visibility Rain Suit
BrandKANGSHIELD
Packing, P/N: SZB-8-12 | HV240/HV1200 Degaser
BrandTSC
NPS1 CL600 Flat welding Flange
BrandRUNYANG
Main Shaft, P/N: HV2400104 | HV240/HV1200 Degaser
BrandTSC
JZLG40 Coiled Tubing Weight Indicator
BrandJPIM
32"NPS 90°Elbow
BrandYSDLGJ
Butt-welded 90° Elbow
BrandYSDLGJ
KV052403 PVC Dipped Gloves
BrandKANGSHIELD
Double Legs Spliced Wire Rope Sling
BrandJ&L
KS021510 Injection Safety Shoes
BrandKANGSHIELD
6"NPS 45°Elbow
BrandYSDLGJ
Metric System HSS Machine Screwtap M5
BrandSHEFFIELD
Mud Pump|RS-F1600FTL
BrandHRSB
NPS3 CL300 Flat Welding Flange
BrandYSDLGJ
Professonal Patchet(Ratchet Wrench)
BrandENDURA
10pcs. Comb. Wrench Set
BrandENDURA