Brand Yuanda
Certification
Lead Time 70days
Guarantee Period 12months
Source of Supply Henan
Payment Method T/T L/C
The boiler adopts the quick installation or assembly structure :4 ~ 8t/h is the quick installation water pipe structure, which leaves the factory after being fully assembled in the factory;10 ~ 15t/h is composed of the upper part and the lower part. The upper part is the body heating surface and the lower part is the combustion equipment.Around the front end of the boiler body for arrangement of water-cooled wall connected to the drum bottom connected to the header of the combustion chamber, to absorb the furnace radiant heat, backend arrangement between water drum on intensive convection tube bundle, high temperature flue gas after combustion after secondary return lateral erosion convection heating surface to separate arrangement of economizer, finally into dust catcher by chimneys;The water-tube boiler assembled above 20t/h is composed of front furnace, rear furnace, convection tube bundle, economizer and chain grate, which are assembled into an integral factory.
Recommendations
Double Legs Spliced Wire Rope Sling
BrandJ&L
Professonal Patchet(Ratchet Wrench)
BrandENDURA
Endless Chain Sling
BrandJ&L
Adjustable WrenchH
BrandENDURA
Oil Filter Wrench
BrandENDURA
DZ5001 Dielectric Constant Tester
BrandERUI
KS021510 Injection Safety Shoes
BrandKANGSHIELD
Makeup and Breakout Tools | Manual Tong Type HT135|7-1/2"~12"|135000 Ft.Lbs
BrandRUTONG
15.88 (5/8) Sucker Rod
BrandZYZJ
Torque Wrench
BrandSHEFFIELD
NPS2 CL600 Flat welding Flange
BrandRUNYANG
32"NPS 90°Elbow
BrandYSDLGJ
JZLG40 Coiled Tubing Weight Indicator
BrandJPIM
10pcs. Comb. Wrench Set
BrandENDURA
SS Ball Valve, 1/2" | HV240/HV1200 Degaser
BrandTSC
Nominal Pressure Level Cast Steel Gate Valve
BrandCD
13 Gauge ANSI Cut Level A2 / ISO 13997 Cut Level B Shell Pu Coating On Palm
BrandJIADELI
4-WEB/X-Arm/Supreme Valve Assy. |Urethane Insert|API-6
BrandKERUI