Brand ZOZEN
Certification
Lead Time 70days
Guarantee Period 12months
Source of Supply Jiangsu
Payment Method T/T L/C
SZS series boilers are of double-pot tube, vertical type and D-type layout structure, with furnace on the right side, convective tube bundles on the left side and superheater with convective tube bundles.The movable supports at the middle and both ends of the boiler barrel are fixed on the body chassis, and the whole boiler is guaranteed to expand to both ends.
Recommendations
3"NPS Butt Welded Equal-diameter Tee
BrandYSDLGJ
3/8" Dr. 6pt Deep Socket
BrandENDURA
12.5mm Universal Joint
BrandENDURA
Swan Hook
BrandJ&L
Cast Steel Lift Check Valve
BrandCD
Rubber Hammer
BrandENDURA
KS021552-Safety Shoes
BrandKANGSHIELD
Rotary Cultivator Of Small Sized Gearbox Series
BrandDAHUA
6-1/2" Double-color Stainless Steel Scissors
BrandSHEFFIELD
9*12mm Rectangular Open End Fitting
BrandENDURA
Standard Oil-injected Screw Air Compressor
BrandDENAIR
KCP52 Coalbed Methane Supercharging and Expansion Compressor
BrandKERUI
Medium Plate Clamp
BrandJ&L
Worm Gear, P/N: TWPX155-8 | Agitator HA-4 Gear Box Parts
BrandTSC
20-106RHBC Rod Pump
BrandFUQIAO
2FZ18-U Double-ram Blowout Preventer
BrandZHONGZHONG
6pcs. Engineering Drills Set
BrandENDURA
25-225THC Tubing Pump
BrandFUQIAO