Brand ZOZEN
Certification
Lead Time 70days
Guarantee Period 12months
Source of Supply Jiangsu
Payment Method T/T L/C
SZS series boilers are of double-pot tube, vertical type and D-type layout structure, with furnace on the right side, convective tube bundles on the left side and superheater with convective tube bundles.The movable supports at the middle and both ends of the boiler barrel are fixed on the body chassis, and the whole boiler is guaranteed to expand to both ends.
Recommendations
NPS8 CL150 SW Flange
BrandYSDLGJ
Shale Shaker Screens Fit BRANDT COBRA/LCM-3D Series Shaker|Composite Material Frame|API 20~API 200
BrandKERUI
Pumping Unit
BrandZYZJ
NPS6 CL150 SW Flange
BrandYSDLGJ
2000PSI AA Tubing Head Housing
BrandLIWEN
NPS1 CL300 Flat Welding Flange
BrandYSDLGJ
CYJY14-4.8-73HF/C Pumping Unit
BrandZYZJ
3000PSI EE Tubing Head Housing
BrandLIWEN
Type Rh01 High Tension Round Sling │High Tensile Endless Type
BrandJ&L
Dotted Gloves
BrandKANGSHIELD
NPS1/2 CL600 Flange
BrandRUNYANG
NPS 1/2 CL300 Blind Flange
BrandYSDLGJ
Double-end Snub Rope
BrandKANGSHIELD
10pcs. Long Ball Point Hex Key Set
BrandENDURA
NPS20 CL900 Flange
BrandRUNYANG
KV060401 Scratch-resistant Gloves
BrandKANGSHIELD
Pumping Unit
BrandXKZ
NPS12 CL150 Blind Flange
BrandRUNYANG