Brand LIWEN
Certification
Lead Time 90days
Guarantee Period 12months
Source of Supply Jiangsu
Payment Method T/T L/C
Function and use:
1. The tubing head housing is mainly composed of the tubing head body, tubing hanger, side outlet valve, sealing ring and other parts. The structure can be selected according to the needs of single wing, double wing structure.
2. Hangers generally choose single tube, double tube and other structural forms.
3. Plate valve can choose PFF, FC, FL, FLS and other structural forms.
4. All pressure gauges are aseismic.
Recommendations
1/4"Dr.50l Torx Bits
BrandENDURA
2FZ18-U Double-ram Blowout Preventer
BrandZHONGZHONG
TSC HMC Series Mud Cleaner | HMC250x2/100x12, HMC250x3/100x16
BrandTSC
3/4" Dr. Extention Bar
BrandENDURA
9*12mm Reversible Ratchet Head
BrandENDURA
Rubber Hammer
BrandENDURA
3-1/2"NPS Butt Welded Equal-diameter Tee
BrandYSDLGJ
6-1/2" Double-color Stainless Steel Scissors
BrandSHEFFIELD
Z331-150 Cup Packer
BrandZHAOXIN
Rotating Shaft Assembly, P/N: HNJ4-02 | Agitator HA-4
BrandTSC
BOMCO F-500 Mud Pump Fluid End Accessories_Inch
BrandKERUI
Suction pump accessories-pump barrel coupling
BrandPYZS
9*12mm Reversible Ratchet Head
BrandENDURA
Pead Below Hammer
BrandENDURA
8pcs. Folding Torx Key Set
BrandENDURA
Upper Impeller Assembly, P/N: HNJ5.5-03 | Agitator HA-5.5
BrandTSC
20-106RHBC Rod Pump
BrandFUQIAO
Screwdriver Phillips
BrandENDURA