Brand ZOZEN
Certification
Lead Time 70days
Guarantee Period 12months
Source of Supply Jiangsu
Payment Method T/T L/C
WNS series horizontal internal combustion boilers are boiler - shell type three - return wet - back oil/gas boilers.The boiler is operated automatically. After the fuel is atomized by the burner, the formed torch is filled in the full corrugated furnace chamber and transmits radiant heat through the furnace chamber wall. This is the first return journey.Of high temperature flue gas in the indoor together, to go to a second return, that is threaded pipe bundle area, the convective heat transfer, after the flue gas temperature is gradually reduced to smoke box, before the return boiler has smoke cigarette before enter the Settings in the top box out of the boiler economizer and condenser, three return boiler flue gas smoke box to enter the third return once upon a time, the light tube bundle area, then the smoke box after entering the economizer and condenser, and finally into the chimney, the atmosphere.
Recommendations
NPS10 CL900 Flange
BrandRUNYANG
Forged Nail Puller
BrandENDURA
TG720L LED Street Lamp
BrandTECHLITE
Explosion-proof Floodlight
BrandOKTECH
Cone Crusher
BrandERUI
PA-4112 Guide Rail Installation Switch Quantity Signal Isolator (Two-in Two-out)
BrandParagon
Bearing 6220, P/N: W21106220| LW450×1000-N
BrandXBSY
Bolt, Impeller Lock, P/N: TS-7415648 | HCP/HCP-S Series Pump Parts
BrandTSC
Gooseneck, P/N: 71.110.00 | DSL-110
BrandRUSHI
NPS1 CL600 SW Flange
BrandRUNYANG
Power Tong Accessories | Jaw, 2-7/8"~8"| ZQ203-100 (II)
BrandRUSHI
FPJ Inside BOP Valve│ Standard Service
BrandSHUANGJIA
FMJ Series Wear Sub|Non-rotating Structure with Low Alloy Steel
BrandSHUANGJIA
Explosion-protected LED Floodlight with Camera
BrandOKTECH
Gooseneck, P/N: RS78.100-02 | SL450/ SL450A
BrandRUSHI
Explosion-proof LED Emergency Floodlight
BrandOKTECH
Pick Up Tool
BrandENDURA
Power Tong Accessories | Griping Cylinder, P/N:01.04.00M |ZQ203-100
BrandRUSHI