Brand ZOZEN
Certification
Lead Time 70days
Guarantee Period 12months
Source of Supply Jiangsu
Payment Method T/T L/C
SZL series double drum vertical chain grate boiler pipe steam and hot water boiler adopts quick installation or assembly structure.4~6t/h is the structure of quick-loading water pipe, which leaves the factory after being fully assembled in the factory;6~35t/h is composed of the upper and lower parts, the upper part is the body heating surface, and the lower part is the combustion equipment.
Recommendations
3000PSI HH PCP Wellhead
BrandLIWEN
Pump Accessories-pump Barrel Valve Cover Reducer
BrandBAOSHI
F48-70 S-shaped Single Ram Blowout Preventer
BrandSHENKAI
20000PSI, 4-1/16 '' Christmas Tree
BrandLIWEN
Grip Tools | Model E Pneumatic Tubing Spider | 175 STON | 2-3/8~7-5/8 IN
BrandRUTONG
K344-94 Fracturing Packer
BrandZHAOXIN
TYX Series Guide Shoe
BrandSHUANGJIA
Power Tong | Tubing Power Tong|XQ140/12Y|2-7/8~5-1/2
BrandRUSHI
Round File
BrandENDURA
Side-open Ram BOP
BrandSHENKAI
Oil Seal of Input Shaft, 50x80x12 | Agitator HA-2.2
BrandTSC
YJS Hydraulic Jar Intensifier
BrandSHUANGJIA
5000PSI, 2-1/16 '' Christmas Tree
BrandLIWEN
Tubing Subsurface Pump
BrandBAOSHI
Hoisting Tools | “Y” Series Slip Type Casing Elevator|HYC Type 200 STON|3-1/2~7-5/8 IN
BrandRUTONG
5/16"Dr. 30L Phillips Bits
BrandENDURA
2"NPS Butt Welded Straight Cross
BrandRUNYANG
Rubber & Plastic Handled Screwdriver Slotted
BrandENDURA