Brand ZOZEN
Certification
Lead Time 70days
Guarantee Period 12months
Source of Supply Jiangsu
Payment Method T/T L/C
SZL series double drum vertical chain grate boiler pipe steam and hot water boiler adopts quick installation or assembly structure.4~6t/h is the structure of quick-loading water pipe, which leaves the factory after being fully assembled in the factory;6~35t/h is composed of the upper and lower parts, the upper part is the body heating surface, and the lower part is the combustion equipment.
Recommendations
Mini Hacksaw With Nylon Handle
BrandENDURA
SL225 Rotary Swivel
BrandRUSHI
20 in SSAW Welding Pipe Gr.B
BrandYULONG
Casing Hanger 2000psi, 13-5/8" X 7-5/8"-DD
BrandLIWEN
Integrated Seal Tester
BrandERUI
Heavy Weight Drill Pipe|Welded
BrandFOUND
Movable Power Station
BrandEuenon
Hoisting Tools | DDZ Series Drill Pipe Elevators |DDZ 250 STON|3-1/2~5-1/2 IN
BrandRUTONG
Bearing Sleeve-Pinion Shaft, P/N: RS11306A.03.004 | RSF-1000
BrandKERUI
3000PSI 2-9/16'' EE Christmas Tree
BrandLIWEN
68 inch Helical Submerged Arc Welded Steel Pipe X42
BrandYULONG
Casing Hanger 2000psi, 13-5/8" X 7"-CC
BrandLIWEN
56 inch Helical Submerged Arc Welded Steel Pipe
BrandYULONG
Casing Hanger 5000psi, 11" X 4-1/2"-HH
BrandLIWEN
Hoisting Tools | Weldless Links |DH250|Rated Capacity 250 STON
BrandRUTONG
Self-propelled Telescopic Boom Lift
BrandSKYBOOM
Flashboard Assy|BOMCO F-1600 / BOMCO F-1300
BrandKERUI
8 inch Helical Submerged Arc Welded Steel Pipe
BrandYULONG