Brand ZOZEN
Certification
Lead Time 70days
Guarantee Period 12months
Source of Supply Jiangsu
Payment Method T/T L/C
SZL series double drum vertical chain grate boiler pipe steam and hot water boiler adopts quick installation or assembly structure.4~6t/h is the structure of quick-loading water pipe, which leaves the factory after being fully assembled in the factory;6~35t/h is composed of the upper and lower parts, the upper part is the body heating surface, and the lower part is the combustion equipment.
Recommendations
Standard Oil-injected Screw Air Compressor
BrandDENAIR
Oil Seal of Input Shaft, 55x80x10 | Agitator HA-5.5/HA-7.5/HA7.5-2
BrandTSC
1/2 In. L-handle
BrandSHEFFIELD
Suction Pump Accessories-Fixed Valve Cover
BrandBAOSHI
Cleaning Sweeper Truck
BrandCLW
ZJW Series Agitator
BrandHuaYou YiJi
Suction pump accessories-pump barrel coupling
BrandPYZS
KCP52 Coalbed Methane Supercharging and Expansion Compressor
BrandKERUI
Suction Pump Accessories-plunger Upper Valve Cover
BrandPYZS
20-106RHBC Rod Pump
BrandFUQIAO
9*12mm Rectangular Open End Fitting
BrandENDURA
Running and Retrieving Tool for VR Plug
BrandSHENKAI
Upper/ Lower Impeller Assembly, P/N: HNJ7.5-04, HNJ7.5-07-2 | Agitator HA-7.5/HA7.5-2
BrandTSC
Pead Below Hammer
BrandENDURA
3/8" Dr. 6PT. Socket
BrandENDURA
Hoisting Tools | BJ Type 350ton Elevator/Spider 4-1/2"~13-3/8" |SEB350
BrandRUTONG
Cast Steel Lift Check Valve
BrandCD
Grade S6 DX Shackle
BrandJ&L