Brand ZOZEN
Certification
Lead Time 70days
Guarantee Period 12months
Source of Supply Jiangsu
Payment Method T/T L/C
SZL series double drum vertical chain grate boiler pipe steam and hot water boiler adopts quick installation or assembly structure.4~6t/h is the structure of quick-loading water pipe, which leaves the factory after being fully assembled in the factory;6~35t/h is composed of the upper and lower parts, the upper part is the body heating surface, and the lower part is the combustion equipment.
Recommendations
Makeup and Breakout Tools | Manual Tong Type HT55 W/LG. Lever|3-1/2"~13-3/8"|55000 Ft.Lbs
BrandRUTONG
3-WEB Valve Assy. |Urethane Insert|API-7
BrandKERUI
Makeup and Breakout Tools | Manual Tong Type SDD|4"~17"|135kN.m
BrandRUTONG
Sliding T-Bar
BrandENDURA
Long Radius 90 ° Elbow
BrandYSDLGJ
SS Ball Valve, 1/2" | HV240/HV1200 Degaser
BrandTSC
Mud Pump|RS-F800
BrandHRSB
Shale Shaker Screen Fits Kem-Tron KTL 28 shaker| Metal Frame|API 20~API 325
BrandKERUI
4pcs. Pliers Tool Kit
BrandENDURA
4-WEB/X-Arm/Supreme Valve Assy. |Urethane Insert|API-6
BrandKERUI
KS0013 Knitted T-shirt
BrandXINDAO
KGS0017 Function Bomber Jacket
BrandKANGSHIELD
4"NPS 90°Elbow
BrandYSDLGJ
C-640D-305-192Pumping Unit
BrandZYZJ
KRONOS 76-110 Anti-Smashing Gloves
BrandKANGSHIELD
KGS0015 High Visibility Rain Suit
BrandKANGSHIELD
Injection Safety Shoes
BrandKANGSHIELD
Professonal Patchet(Ratchet Wrench)
BrandENDURA