Brand ZOZEN
Certification
Lead Time 70days
Guarantee Period 12months
Source of Supply Jiangsu
Payment Method T/T L/C
SZL series double drum vertical chain grate boiler pipe steam and hot water boiler adopts quick installation or assembly structure.4~6t/h is the structure of quick-loading water pipe, which leaves the factory after being fully assembled in the factory;6~35t/h is composed of the upper and lower parts, the upper part is the body heating surface, and the lower part is the combustion equipment.
Recommendations
58pcs. 1/2" Dr. Socket Set
BrandENDURA
Flame Retardant Antistatic Explosive Proof Intelligent Thermal Suit (Vest)
BrandKANGSHIELD
NPS4 CL150 SW Flange
BrandRUNYANG
NPS 1/2 CL300 Blind Flange
BrandYSDLGJ
Pumping Unit
BrandZYZJ
Pumping Unit
BrandXKZ
Beam Hanger
BrandERUI
2000PSI DD Tubing Head Housing
BrandLIWEN
34pcs. 3/8" Dr. Socket Set
BrandENDURA
NPS 24 CL1500 Flange
BrandRUNYANG
25Pc Tool Set
BrandSHEFFIELD
NPS20 CL150 Flange
BrandRUNYANG
Pumping Unit
BrandZYZJ
Pumping Unit
BrandZYZJ
NPS2 1/2 CL150 SW Flange
BrandRUNYANG
1"Dr. Socket Set
BrandENDURA
Beam-pumping Unit
BrandJACK
CBXK Explosion-proof Travel Switch (II B, II C, tD)
BrandCNYA