Brand ZOZEN
Certification
Lead Time 70days
Guarantee Period 12months
Source of Supply Jiangsu
Payment Method T/T L/C
SZL series double drum vertical chain grate boiler pipe steam and hot water boiler adopts quick installation or assembly structure.4~6t/h is the structure of quick-loading water pipe, which leaves the factory after being fully assembled in the factory;6~35t/h is composed of the upper and lower parts, the upper part is the body heating surface, and the lower part is the combustion equipment.
Recommendations
Spare parts for Weatherford MP8 Triplex Mud Pump, P/N: 11198210 | MP-5
BrandKERUI
Dial Gauge
BrandENDURA
VDE Insulated Diagonal Plier
BrandENDURA
Clamp Seal, 5"/6“/”8", P/N: HD140-02, HD168-02, HD219-02 | HD Series Desander
BrandTSC
New Type Non-pollution Hot Washing Equipment
BrandERUI
VDE Insulated Torque Wrench
BrandENDURA
Seal, Cylliner Head, P/N:AH1301010508, AH36001-05.08 |BOMCO F-1300/1600
BrandKERUI
Hand Grease Gun
BrandENDURA
VDE Insulated Bolt Cutter
BrandENDURA
Floodlight Lithium Working Lamp
BrandENDURA
Union
BrandYSDLGJ
10 inch Helical Submerged Arc Welded Steel Pipe
BrandYULONG
Upper Guide Plate, P/N: RS11309.04.002 | RS F-1300/RS F-1600
BrandKERUI
Seat-Small Spring P/N: HD100-13 | HM Series Desilter
BrandTSC
2'' ERW Welding Pipe Gr.B
BrandUnited Steel Pipe
Pumping Unit Control Cabinet
BrandERUI
Hydraulic Puller
BrandENDURA
34 inch Helical Submerged Arc Welded Steel Pipe
BrandYULONG