Brand ZOZEN
Certification
Lead Time 70days
Guarantee Period 12months
Source of Supply Jiangsu
Payment Method T/T L/C
SZL series double drum vertical chain grate boiler pipe steam and hot water boiler adopts quick installation or assembly structure.4~6t/h is the structure of quick-loading water pipe, which leaves the factory after being fully assembled in the factory;6~35t/h is composed of the upper and lower parts, the upper part is the body heating surface, and the lower part is the combustion equipment.
Recommendations
4"NPS 45°Elbow
BrandYSDLGJ
NPS3 CL300 Flat Welding Flange
BrandYSDLGJ
28"NPS 90°Elbow
BrandYSDLGJ
Adjustable WrenchH
BrandENDURA
Sliding T-Bar
BrandENDURA
Normal Level 0.5 Large-Diameter Oval Gear Flowmeter
BrandHENGHE
Makeup and Breakout Tools | Manual Tong Type HT135|7-1/2"~12"|135000 Ft.Lbs
BrandRUTONG
4"NPS 90°Elbow
BrandYSDLGJ
Heavy-Duty Open-end Wrenches
BrandENDURA
Nominal Pressure Level Cast Steel Gate Valve
BrandCD
1 1/4"NPS 90°Elbow
BrandRUNYANG
Y Type Socket Wrench
BrandENDURA
Four Legs Pressed Steel Wire Rope Sling
BrandJ&L
3/4" Dr. Socket Set
BrandENDURA
NPS2 CL600 Flat welding Flange
BrandRUNYANG
KS021510 Injection Safety Shoes
BrandKANGSHIELD
13 Gauge ANSI Cut Level A2 / ISO 13997 Cut Level B Shell Pu Coating On Palm
BrandJIADELI
Butt-welded 90° Elbow
BrandYSDLGJ