Brand ZOZEN
Certification
Lead Time 70days
Guarantee Period 12months
Source of Supply Jiangsu
Payment Method T/T L/C
SZL series double drum vertical chain grate boiler pipe steam and hot water boiler adopts quick installation or assembly structure.4~6t/h is the structure of quick-loading water pipe, which leaves the factory after being fully assembled in the factory;6~35t/h is composed of the upper and lower parts, the upper part is the body heating surface, and the lower part is the combustion equipment.
Recommendations
SL225 Rotary Swivel
BrandRUSHI
O Ring Sub
BrandDRIPRO
Self-propelled Scissor Lifts
BrandSKYBOOM
Soft Seal Butterfly Valve
BrandCD
3pcs. Wood Chisel Set
BrandENDURA
20'' ERW Welding Pipe X46
BrandUnited Steel Pipe
Self-propelled Telescopic Boom Lift
BrandSKYBOOM
Casing Hanger 3000psi, 11" X 5-1/2"-AA
BrandLIWEN
Casing Hanger 3000psi, 9 X 4 1/2-AA
BrandLIWEN
TSC HD Series Desander | HD-250x2, HD-250x3, HD-300x2, HD-300x3
BrandTSC
2 inch Seamless Line Pipe X42
BrandXINBAOYI
Hoisting Tools | DDZ Series Drill Pipe Elevators |DDZ 250 STON|3-1/2~5-1/2 IN
BrandRUTONG
Casing Hanger 5000psi, 13-5/8" X 9-5/8"-CC
BrandLIWEN
Insulated Screwdriver Slotted
BrandENDURA
Vde Insulated Construction Wrench
BrandENDURA
Flange Centerline Butterfly Valve
BrandCD
Casing Hanger 3000psi, 13-5/8" X 9-5/8"-FF
BrandLIWEN
3-layer Disposable Mask with Breathable and Lightweight(Adult Version)
BrandKANGSHIELD