Brand ZOZEN
Certification
Lead Time 70days
Guarantee Period 12months
Source of Supply Jiangsu
Payment Method T/T L/C
SZL series double drum vertical chain grate boiler pipe steam and hot water boiler adopts quick installation or assembly structure.4~6t/h is the structure of quick-loading water pipe, which leaves the factory after being fully assembled in the factory;6~35t/h is composed of the upper and lower parts, the upper part is the body heating surface, and the lower part is the combustion equipment.
Recommendations
Casing Hanger 5000psi, 13-5/8" X 7"-BB
BrandLIWEN
Casing Hanger 5000psi, 11" X 5-AA
BrandLIWEN
3000 PSI EE Electric Pump Wellhead
BrandLIWEN
10000PSI Christmas Tree
BrandLIWEN
Casing Hanger 5000psi, 13-5/8" X 5-1/2"-AA
BrandLIWEN
Casing Hanger 3000psi, 11" X 7"-EE
BrandLIWEN
Casing Hanger 5000psi, 11" X 4-1/2"-DD
BrandLIWEN
3/4” NPS Pipe Cap
BrandYSDLGJ
Bearing 4G32840H, P/N: AH1001010312 , AH33001-03.12 |BOMCO F-1300/1600
BrandKERUI
Casing Hanger 2000psi, 9 X 4 1/2-AA
BrandLIWEN
Casing Hanger 3000psi, 13-5/8" X 7"-AA
BrandLIWEN
Hacksaw
BrandENDURA
3000PSI EE PCP Wellhead
BrandLIWEN
5000PSI BB Water Injection Wellhead
BrandLIWEN
Casing Hanger 2000psi, 11" X 5--EE
BrandLIWEN
3000PSI 2-9/16'' AA Christmas Tree
BrandLIWEN
92 Series Alumina Grinding Ball
BrandJINGANG
3000PSI 2-1/16'' CC Christmas Tree
BrandLIWEN