Brand ZOZEN
Certification
Lead Time 70days
Guarantee Period 12months
Source of Supply Jiangsu
Payment Method T/T L/C
SZL series double drum vertical chain grate boiler pipe steam and hot water boiler adopts quick installation or assembly structure.4~6t/h is the structure of quick-loading water pipe, which leaves the factory after being fully assembled in the factory;6~35t/h is composed of the upper and lower parts, the upper part is the body heating surface, and the lower part is the combustion equipment.
Recommendations
Doubleleg Pressed Steel Wire Rope Sling
BrandJ&L
100% Cotton Flame Retardant Coverall
BrandXINDAO
Copper Core Cross-Linked Polyolefin Insulated Halogen-Free Low-Smoke Flame-Retardant Wire
Branddalu
Oil Filter Wrench
BrandENDURA
DJFY-5×16 Electric Winch
BrandJULING
1 1/4"NPS 90°Elbow
BrandRUNYANG
Sliding T-Bar
BrandENDURA
Main Shaft, P/N: HV2400104 | HV240/HV1200 Degaser
BrandTSC
NPS3 CL300 Flat Welding Flange
BrandYSDLGJ
CL Series Fishing Magnet│ Type A│ Type B
BrandSHUANGJIA
JQHS-50×20X Air Winch
BrandJULING
Nominal Pressure Level Cast Steel Gate Valve
BrandCD
DZ5001 Dielectric Constant Tester
BrandERUI
15.88 (5/8) Sucker Rod
BrandZYZJ
Injection Safety Shoes
BrandKANGSHIELD
HG20613-40Cr Full Thread Stud-blackened
BrandTB
3/4" Dr. Socket Set
BrandENDURA
Fishing Cup
BrandGAOFENG