Brand ZOZEN
Certification
Lead Time 70days
Guarantee Period 12months
Source of Supply Jiangsu
Payment Method T/T L/C
SZL series double drum vertical chain grate boiler pipe steam and hot water boiler adopts quick installation or assembly structure.4~6t/h is the structure of quick-loading water pipe, which leaves the factory after being fully assembled in the factory;6~35t/h is composed of the upper and lower parts, the upper part is the body heating surface, and the lower part is the combustion equipment.
Recommendations
TSC HMC Series Mud Cleaner | HMC250x2/100x12, HMC250x3/100x16
BrandTSC
BZ Mechanical Drilling Jar
BrandSHUANGJIA
3/4" Dr. Extention Bar
BrandENDURA
Go Through Screwdriver Slotted
BrandENDURA
Bladder Assy, P/N:AK4535020400 |BOMCO F-500/F-800
BrandKERUI
Rubber Hammer
BrandENDURA
Suction Pump Accessories-pump Barrel Closed Valve Cover
BrandBAOSHI
Grade S6 DX Shackle
BrandJ&L
QYZ Hydraulic Drilling Jar
BrandSHUANGJIA
KCP75 Low Pressure Coalbed Methane Supercharging Screw Compressor
BrandKERUI
Upper Impeller Assembly, P/N: HNJ5.5-03 | Agitator HA-5.5
BrandTSC
Replaceable Urethane Pistons|Sizes in Millimeters|With Piston Bore 38.1mm
BrandKERUI
Cast Steel Lift Check Valve
BrandCD
Running and Retrieving Tool for VR Plug
BrandSHENKAI
Suction Pump Accessories-stem Reducer
BrandBAOSHI
4"NPS Butt Welded Straight Cross
BrandRUNYANG
3"NPS Butt Welded Equal-diameter Tee
BrandYSDLGJ
1/4" Dr. 25l Torx Bits
BrandENDURA