Brand ZOZEN
Certification
Lead Time 70days
Guarantee Period 12months
Source of Supply Jiangsu
Payment Method T/T L/C
SZL series double drum vertical chain grate boiler pipe steam and hot water boiler adopts quick installation or assembly structure.4~6t/h is the structure of quick-loading water pipe, which leaves the factory after being fully assembled in the factory;6~35t/h is composed of the upper and lower parts, the upper part is the body heating surface, and the lower part is the combustion equipment.
Recommendations
Rubber Strip, P/N: HD00-03 | HD Series Desander
BrandTSC
50pcs. VDE Insulated Screwdrivers Set
BrandENDURA
Roller Kelly Bushing|20-HDP | Other Pipe Handling Tools
BrandRUTONG
A Type 100 / 20t Double Beam Hook Gantry Crane
BrandWEIHUA
52 inch Helical Submerged Arc Welded Steel Pipe
BrandYULONG
18'' ERW Welding Pipe X52
BrandUnited Steel Pipe
Coupling
BrandYSDLGJ
Seal, Cylliner Head, P/N:AH1301010508, AH36001-05.08 |BOMCO F-1300/1600
BrandKERUI
FFP2 CE EN 149 Bowl-shaped No Vlave Mask
BrandKANGSHIELD
Mud Guard Plate, P/N: RS11306.04.008 | RSF-1000
BrandKERUI
TSC HLGS Series Mud Gas Seperator (Gas-buster or Poor boy degasser) | HLGS800 / 1000 / 1200| 1.0MPA / 4.0MPA
BrandTSC
2'' ERW Welding Pipe Gr.B
BrandUnited Steel Pipe
Anti-explosion Headlight
BrandENDURA
Scribers
BrandENDURA
Seat-Small Spring, P/N: HD100-13 | HD Series Desander
BrandTSC
2 inch Seamless Line Pipe X52
BrandXINBAOYI
Medical Disposable Cap
BrandSHOW LONG
2'' ERW Welding Pipe Gr.B
BrandUnited Steel Pipe