Brand ZOZEN
Certification
Lead Time 70days
Guarantee Period 12months
Source of Supply Jiangsu
Payment Method T/T L/C
SZL series double drum vertical chain grate boiler pipe steam and hot water boiler adopts quick installation or assembly structure.4~6t/h is the structure of quick-loading water pipe, which leaves the factory after being fully assembled in the factory;6~35t/h is composed of the upper and lower parts, the upper part is the body heating surface, and the lower part is the combustion equipment.
Recommendations
Bonded V-Belt, 4ZV25J, 5ZV25J | For Mud Pump Drive
BrandXLFT
Bearing 6217, P/N: W21106217| LW450×1000-N
BrandXBSY
BJ Wiper
BrandSHUANGJIA
Overload Protection Device, P/N: X05310158| LW450×1000-N
BrandXBSY
Magnetic V-Block
BrandENDURA
VDE Insulated Junior Hacksaw
BrandENDURA
T Type Tap Wrench
BrandENDURA
16pcs. VDE Insulated Tools Set
BrandENDURA
JTB Series Drive Sub
BrandSHUANGJIA
Nineteen Mm Torque Wrench
BrandENDURA
Mica Heater/Tips
BrandENDURA
Power Tong Accessories | Die, P/N: 01.01-27MG | ZQ203-100
BrandRUSHI
Power Tong Accessories | Die, P/N: 24.100-03|TQ340-35
BrandRUSHI
LLSeries Vertical Cuttings Dryer|LL700|LL915
BrandXBSY
Mini Magnetic Stand
BrandENDURA
Power Tong Accessories | Locating Handle, P/N: 01.01.01.00M | ZQ162-50, ZQ203-100
BrandRUSHI
Bolt, Impeller Lock, P/N: TS-7415648 | HSP Shear Pump Parts
BrandTSC
U Type 20/5-32/5t Double Beam Hook Gantry Crane
BrandWEIHUA