Brand ZOZEN
Certification
Lead Time 70days
Guarantee Period 12months
Source of Supply Jiangsu
Payment Method T/T L/C
SZL series double drum vertical chain grate boiler pipe steam and hot water boiler adopts quick installation or assembly structure.4~6t/h is the structure of quick-loading water pipe, which leaves the factory after being fully assembled in the factory;6~35t/h is composed of the upper and lower parts, the upper part is the body heating surface, and the lower part is the combustion equipment.
Recommendations
Towing Belt for Cars
BrandJ&L
Suction Pump Accessories-internal Thread Plunger Connector
BrandPYZS
Straight Cutting Snips
BrandENDURA
20000PSI, 4-1/16 '' Christmas Tree
BrandLIWEN
2000 PSI FF Electric Pump Wellhead
BrandLIWEN
Integral Spring Centralizer
BrandSHANGSHAN
20 Tons Cleaning Sweeper Truck
BrandCLW
Pump Accessories-pump Barrel Valve Cover Reducer
BrandBAOSHI
Power Tong | Tubing Power Tong|XQ140/12Y|2-7/8~5-1/2
BrandRUSHI
Round File 10"
BrandENDURA
Hoisting Tools | Varco Type 500ton Elevator/Spider|SE500 16"~24-1/2"
BrandRUTONG
1/4"Dr.50L Phillips Bits
BrandENDURA
Grip Tools | Model E Pneumatic Tubing Spider | 175 STON | 2-3/8~7-5/8 IN
BrandRUTONG
5000PSI CC Water Injection Wellhead
BrandLIWEN
20000PSI, 3-1/8 '' Christmas Tree
BrandLIWEN
13pcs. Engineering Drills Set
BrandENDURA
File
BrandENDURA
Desulfurizer (Triazines)
BrandDFHG