Brand ZOZEN
Certification
Lead Time 70days
Guarantee Period 12months
Source of Supply Jiangsu
Payment Method T/T L/C
SZL series double drum vertical chain grate boiler pipe steam and hot water boiler adopts quick installation or assembly structure.4~6t/h is the structure of quick-loading water pipe, which leaves the factory after being fully assembled in the factory;6~35t/h is composed of the upper and lower parts, the upper part is the body heating surface, and the lower part is the combustion equipment.
Recommendations
Casing Hanger 5000psi, 11" X 5-1/2"-EE
BrandLIWEN
Main Bearing, P/N: AH1001010218 | BOMCO F-1000
BrandKERUI
Roller Kelly Bushing|RTS4 | Other Pipe Handling Tools
BrandRUTONG
Mini Hacksaw With Nylon Handle
BrandENDURA
3000PSI 4-1/16'' EE Christmas Tree
BrandLIWEN
Apex, Ø30 / Ø25 / Ø20, P/N: HD300-0830,HD300-0825,HD300-0820 | HD Series Desander
BrandTSC
Casing Hanger 5000psi, 13-5/8" X 7"-FF
BrandLIWEN
Casing Hanger 3000psi, 13-5/8" X 9-5/8"-HH
BrandLIWEN
Sucker Rod Standard Coupling
BrandRZGY
Casing Hanger 5000psi, 11" X 4-1/2"-HH
BrandLIWEN
22 inch Helical Submerged Arc Welded Steel Pipe
BrandYULONG
3000PSI 2-9/16'' EE Christmas Tree
BrandLIWEN
Self-propelled Scissor Lifts
BrandSKYBOOM
Tetrachloroethene
BrandERUI
18'' ERW Welding Pipe X70
BrandUnited Steel Pipe
Hoisting Tools | DDZ Series Drill Pipe Elevators |DDZ 250 STON|3-1/2~5-1/2 IN
BrandRUTONG
Gasoline Generators
BrandDONGMING
High-Tensile Steel Compact Chains For Mining
BrandJ&L