Brand ZOZEN
Certification
Lead Time 70days
Guarantee Period 12months
Source of Supply Jiangsu
Payment Method T/T L/C
SZL series double drum vertical chain grate boiler pipe steam and hot water boiler adopts quick installation or assembly structure.4~6t/h is the structure of quick-loading water pipe, which leaves the factory after being fully assembled in the factory;6~35t/h is composed of the upper and lower parts, the upper part is the body heating surface, and the lower part is the combustion equipment.
Recommendations
Bearing 4G32836H, P/N: AH0801010312, AH34001-03.11 |BOMCO F-800
BrandKERUI
Casing Hanger 3000psi, 13-5/8" X 7"-HH
BrandLIWEN
5000PSI BB Water Injection Wellhead
BrandLIWEN
Main Bearing, P/N: 3G4053156H | RSF-1000
BrandKERUI
Hoisting Tools | TA Series Drill Collar Elevators |35 STON|2-7/8~3-1/8 IN
BrandRUTONG
3000PSI 2-9/16'' HH Christmas Tree
BrandLIWEN
Hand Saw
BrandSHEFFIELD
Casing Hanger 5000psi, 13-5/8" X 7-5/8"-CC
BrandLIWEN
3000PSI 2-1/16'' CC Christmas Tree
BrandLIWEN
Xanthan Gum
BrandHAILANCHEM
3000 PSI CC Electric Pump Wellhead
BrandLIWEN
3Pc.Mini Saw Blades
BrandENDURA
Rugged Gamma Ray Tool
BrandWELL-SUN
Brake-Shoe, P/N: E01.01.01.00 | ZQ203-100
BrandRUSHI
87 Series Alumina Ball
BrandJINGANG
Three Eccentric Multi-Layer Metal Seal Butterfly Valve With Clamp Connection
BrandCD
10000PSI Christmas Tree
BrandLIWEN
Casing Hanger 2000psi, 13-5/8" X 7-5/8"-CC
BrandLIWEN