Brand ZOZEN
Certification
Lead Time 70days
Guarantee Period 12months
Source of Supply Jiangsu
Payment Method T/T L/C
SZL series double drum vertical chain grate boiler pipe steam and hot water boiler adopts quick installation or assembly structure.4~6t/h is the structure of quick-loading water pipe, which leaves the factory after being fully assembled in the factory;6~35t/h is composed of the upper and lower parts, the upper part is the body heating surface, and the lower part is the combustion equipment.
Recommendations
32 inch Helical Submerged Arc Welded Steel Pipe
BrandYULONG
Flexible Butterfly Valve
BrandCD
Casing Hanger 5000psi, 11" X 5-EE
BrandLIWEN
Vde Insulated Construction Wrench
BrandENDURA
Casing Hanger 5000psi, 13-5/8" X 7"-FF
BrandLIWEN
6pcs. CR-V Punch Set
BrandENDURA
Casing Hanger 2000psi, 11" X 5-AA
BrandLIWEN
Hoisting Tools | Weldless Links |DH250|Rated Capacity 250 STON
BrandRUTONG
Movable Power Station
BrandEuenon
3000PSI 5-1/8'' AA Christmas Tree
BrandLIWEN
Lifting Cap│ Welded
BrandSHUANGJIA
O Ring Sub
BrandDRIPRO
Vertical Storage Tank
BrandERUI
Apex Ø8, P/N: HM100-0408 | HM Series Desilter
BrandTSC
93 Series Alumina Grinding Ball
BrandJINGANG
electromagnetic anti-paraffin device
BrandERUI
Casing Hanger 5000psi, 11" X 5-FF
BrandLIWEN
20 in SSAW Welding Pipe Gr.B
BrandYULONG