Brand ZOZEN
Certification
Lead Time 70days
Guarantee Period 12months
Source of Supply Jiangsu
Payment Method T/T L/C
SZL series double drum vertical chain grate boiler pipe steam and hot water boiler adopts quick installation or assembly structure.4~6t/h is the structure of quick-loading water pipe, which leaves the factory after being fully assembled in the factory;6~35t/h is composed of the upper and lower parts, the upper part is the body heating surface, and the lower part is the combustion equipment.
Recommendations
Lifting Cap│ Welded
BrandSHUANGJIA
Casing Hanger 2000psi, 13-5/8" X 9-5/8"-AA
BrandLIWEN
O-Ring, GB3452.1 |BOMCO F-1300/1600
BrandKERUI
Sucker Rod Outer Flow Passage Sub-coupling
BrandRZGY
Sucker Rod Integral Flow Passage Sub- coupling
BrandRZGY
Flexible Butterfly Valve
BrandCD
3000PSI 2-9/16'' EE Christmas Tree
BrandLIWEN
90 Series Alumina Grinding Ball
BrandJINGANG
Cold Chisel Forged Nail
BrandENDURA
3000PSI 1-13/16'' BB Christmas Tree
BrandLIWEN
Hoisting Tools | Weldless Links |DH250|Rated Capacity 250 STON
BrandRUTONG
Roller Kelly Bushing|RTS4 | Other Pipe Handling Tools
BrandRUTONG
Heavy Weight Drill Pipe|Welded
BrandFOUND
68 inch Helical Submerged Arc Welded Steel Pipe X46
BrandYULONG
Self-propelled Scissor Lifts
BrandSKYBOOM
Apex Ø8, P/N: HM100-0408 | HM Series Desilter
BrandTSC
Casing Hanger 2000psi, 9 X 4 1/2-HH
BrandLIWEN
Sucker Rod Standard Coupling
BrandRZGY