Brand ZOZEN
Certification
Lead Time 70days
Guarantee Period 12months
Source of Supply Jiangsu
Payment Method T/T L/C
SZS series boilers are double drums, vertical type, D-type layout structure, the right side is the furnace, the left side is the convection tube bundle, and the superheater is arranged in the convection tube bundle area; it is fixed on the body chassis through the movable supports at the middle and both ends of the lower drum And ensure that the whole boiler expands to both ends. The furnace wall is surrounded by a membrane water wall. The membrane water wall on the left side of the furnace completely seals and separates the furnace and the convection tube bundle. The rear of the convection tube bundle area is a thin staggered structure, and the front is an inline structure. The smoke generated by the furnace combustion The gas enters the burn-out chamber and the convection tube bundle area from the smoke outlet at the end of the furnace, and then turns from the front of the left side of the boiler into the spiral finned tube economizer and condenser, and finally enters the flue duct to be discharged into the atmosphere.
Recommendations
Double-end Snub Rope
BrandKANGSHIELD
NPS2 CL300 SW Flange
BrandYSDLGJ
Pumping Unit
BrandZYZJ
Tubing
BrandXINBAOYI
Pumping Unit
BrandXKZ
NPS2 1/2 CL150 SW Flange
BrandRUNYANG
Dotted Gloves
BrandKANGSHIELD
Rubber Handle Knife
BrandENDURA
Pumping Unit
BrandXKZ
42.16mm J55 Tubing
BrandXINBAOYI
B-25D-67-36 Pumping Unit
BrandZYZJ
58pcs. 1/2" Dr. Socket Set
BrandENDURA
Sliding Pad, P/N: HSTJ-02 |HS Shale Shaker
BrandTSC
C-160D-173-74Pumping Unit
BrandZYZJ
NPS2 CL600 SW Flange
BrandYSDLGJ
ASMEB18.2.1-65Mn Single Coil Spring Lock Washers-zinc Plating-yellow
BrandTB
NPS20 CL900 Flange
BrandRUNYANG
2000PSI DD Tubing Head Housing
BrandLIWEN