Brand LIWEN
Certification
Lead Time 90days
Guarantee Period 12months
Source of Supply Jiangsu
Payment Method T/T L/C
Function and use:
1. The tubing head housing is mainly composed of the tubing head body, tubing hanger, side outlet valve, sealing ring and other parts. The structure can be selected according to the needs of single wing, double wing structure.
2. Hangers generally choose single tube, double tube and other structural forms.
3. Plate valve can choose PFF, FC, FL, FLS and other structural forms.
4. All pressure gauges are aseismic.
Recommendations
Diesel Pile Hammer ∣ D180 D260 D300, DELMAG
BrandDELMAG
NPS4 CL150 SW Flange
BrandYSDLGJ
Two-way air switch, Rc1/4, QF501A | SL450A
BrandRUSHI
Power Tong Accessories | Jaw Assy., Size 5-1/2″, 7″, 9-5/8″, 13-3/8″|TQ340-35
BrandRUSHI
Pumping Unit
BrandZYZJ
XS Series Kelly Valve/Cock|Sour Gas Service
BrandSHUANGJIA
8116 Explosion-protected LED Floodlight
BrandOKTECH
Bellows Sealed Ball Valves
BrandCD
Sleeve, Shaft (M.S. Pump), P/N: TS-20943-21 | HCP/HCP-S Series Pump Parts
BrandTSC
5000PSI BB Tubing Head Housing
BrandLIWEN
Packing Assembly, RS76.120.00A | SL225
BrandRUSHI
TG720L LED Street Lamp
BrandTECHLITE
15000PSI EE Tubing Head Housing
BrandLIWEN
QZ941F DN80 Class150 Integral Ball Valve
BrandCD
HSQ6y-200 Automatic Transfer Switching Equipment
BrandHANGSHEN ELECTRIC
Spacer, Lower, P/N: RS72.130-11 |SL135 / SL170
BrandRUSHI
Casting Equipment
BrandANTAI
O-Ring/ Seal, TS-7496-26, TS-7496-253, TS-23444-01-72 | HSP Series Pump Parts
BrandTSC