Brand Yuanda
Certification
Lead Time 70days
Guarantee Period 12months
Source of Supply Henan
Payment Method T/T L/C
WNS series horizontal internal combustion boilers are boiler - shell type three - return wet - back oil/gas boilers.The boiler is operated automatically. After the fuel is atomized by the burner, the formed torch is filled in the full corrugated furnace chamber and transmits radiant heat through the furnace chamber wall. This is the first return journey.
Recommendations
KS021503 Injection Safety Shoes
BrandKANGSHIELD
Grommet Sling
BrandJ&L
4"NPS 45°Elbow
BrandYSDLGJ
Makeup and Breakout Tools | Manual Tong Type HT14|2-3/8"~7"|12000 Ft.Lbs
BrandRUTONG
Injection Safety Shoes
BrandKANGSHIELD
12"NPS 45°Elbow
BrandYSDLGJ
2 1/2"NPS 90°Elbow
BrandRUNYANG
KS021510 Injection Safety Shoes
BrandKANGSHIELD
DPI10C Pressure Transmitter
BrandBAISSDE
Makeup and Breakout Tools | Manual Tong Type HT135|7-1/2"~12"|135000 Ft.Lbs
BrandRUTONG
DJFY-5×16 Electric Winch
BrandJULING
4-WEB/X-Arm/Supreme Valve Assy. |Urethane Insert|API-6
BrandKERUI
Torque Wrench
BrandSHEFFIELD
JQHS-50×20X Air Winch
BrandJULING
9pcs. Comb Wrench Set
BrandENDURA
Main Shaft, P/N: HV2400104 | HV240/HV1200 Degaser
BrandTSC
58 Pc Tool Set
BrandSHEFFIELD
Sliding T-Bar
BrandENDURA