Brand Yuanda
Certification
Lead Time 70days
Guarantee Period 12months
Source of Supply Henan
Payment Method T/T L/C
The boiler adopts the quick installation or assembly structure :4 ~ 8t/h is the quick installation water pipe structure, which leaves the factory after being fully assembled in the factory;10 ~ 15t/h is composed of the upper part and the lower part. The upper part is the body heating surface and the lower part is the combustion equipment.Around the front end of the boiler body for arrangement of water-cooled wall connected to the drum bottom connected to the header of the combustion chamber, to absorb the furnace radiant heat, backend arrangement between water drum on intensive convection tube bundle, high temperature flue gas after combustion after secondary return lateral erosion convection heating surface to separate arrangement of economizer, finally into dust catcher by chimneys;The water-tube boiler assembled above 20t/h is composed of front furnace, rear furnace, convection tube bundle, economizer and chain grate, which are assembled into an integral factory.
Recommendations
F48-70 S-shaped Single Ram Blowout Preventer
BrandSHENKAI
20000PSI, 3-1/8 '' Christmas Tree
BrandLIWEN
Sector Acoustic Logging Instrument
BrandWELL-SUN
Grip Tools | Insert Used for DC-S, DCS-R And DCS-L Drill Collar Slips
BrandRUTONG
Hoisting Tools | Varco Type 500ton Elevator/Spider|SE500 16"~24-1/2"
BrandRUTONG
Pump Accessories-pump Barrel Valve Cover Reducer
BrandBAOSHI
Grade T8 DX Shackle
BrandJ&L
Round File
BrandENDURA
20-125RWBC Rod Pump
BrandFUQIAO
Bits Handle
BrandENDURA
Rigid Vertical Bar Centralizer
BrandSHANGSHAN
Petroleum Drilling Grade Xanthan Gum
BrandHAILANCHEM
KCP76 Pipe Gas Treatment Compressor
BrandKERUI
12.5mm Speeder Handle
BrandSHEFFIELD
Grip Tools | WA-T Type Safety Clamp
BrandRUTONG
Half-Round File
BrandENDURA
Power Tong | Drill Pipe Power Tong|ZQ216-135II|3-1/2~8-1/2
BrandRUSHI
File
BrandENDURA