Brand Yuanda
Certification
Lead Time 70days
Guarantee Period 12months
Source of Supply Henan
Payment Method T/T L/C
The boiler adopts the quick installation or assembly structure :4 ~ 8t/h is the quick installation water pipe structure, which leaves the factory after being fully assembled in the factory;10 ~ 15t/h is composed of the upper part and the lower part. The upper part is the body heating surface and the lower part is the combustion equipment.Around the front end of the boiler body for arrangement of water-cooled wall connected to the drum bottom connected to the header of the combustion chamber, to absorb the furnace radiant heat, backend arrangement between water drum on intensive convection tube bundle, high temperature flue gas after combustion after secondary return lateral erosion convection heating surface to separate arrangement of economizer, finally into dust catcher by chimneys;The water-tube boiler assembled above 20t/h is composed of front furnace, rear furnace, convection tube bundle, economizer and chain grate, which are assembled into an integral factory.
Recommendations
L Type 16 / 3.2-20 / 5t Single Beam Hook Gantry Crane
BrandWEIHUA
FP Inside BOP Valve│ Standard Service
BrandSHUANGJIA
Metering Tank
BrandERUI
Power Tong Accessories | Die, P/N: 24.100-03|TQ340-35
BrandRUSHI
Mica Heater/Tips
BrandENDURA
25pcs. VDE Insulated Tools Set
BrandENDURA
Upper Guide Plate, P/N: AH1001010402, AH33001-04.02 | BOMCO F-1000
BrandKERUI
5000PSI HH Tubing Head Housing
BrandLIWEN
Bolt, Impeller Lock, P/N: TS-7415648 | HSP Shear Pump Parts
BrandTSC
6.3mm Insulated Screwdriver
BrandENDURA
Esd Adjustable Wrist Strap
BrandENDURA
Hand Riveter
BrandENDURA
11pcs. VDE Insulated Tools Set
BrandENDURA
27pcs. Letter Punch
BrandENDURA
UR-ⅡDrilling Type Variable Diameter Hole Openers
BrandSHUANGJIA
Bearing 6217, P/N: W21106217| LW450×1000-N
BrandXBSY
Wear-proof disk| LGF-1300 / LGF-1600
BrandKERUI
Bearing 6016, P/N: GB/T276| LW450×1000-N
BrandXBSY