Brand Yuanda
Certification
Lead Time 70days
Guarantee Period 12months
Source of Supply Henan
Payment Method T/T L/C
SZS series boilers are of double-pot tube, vertical type and D-type layout structure, with furnace on the right side, convective tube bundles on the left side and superheater with convective tube bundles.The movable supports at the middle and both ends of the boiler barrel are fixed on the body chassis, and the whole boiler is guaranteed to expand to both ends.
Recommendations
Petroleum Products Condensation Point and Pour Point Measuring Equipment
BrandERUI
Packing, P/N: SZB-8-12 | HV240/HV1200 Degaser
BrandTSC
KS021508 Injection Safety Shoes
BrandKANGSHIELD
Injection Safety Shoes4
BrandKANGSHIELD
Vacuum Regulating Valve, P/N: HV24011 | HV240/HV1200 Degaser
BrandTSC
QYB102 Series Pressure Transmitter
BrandKADUN
Adjustable WrenchH
BrandENDURA
4"NPS 45°Elbow
BrandYSDLGJ
Heavy-Duty Open-end Wrenches
BrandENDURA
DPI10C Pressure Transmitter
BrandBAISSDE
2"NPS 90°Elbow
BrandRUNYANG
C-640D-305-192Pumping Unit
BrandZYZJ
KC040101 Rain Coat
BrandKANGSHIELD
KGS0017 Function Bomber Jacket
BrandKANGSHIELD
KV052403 PVC Dipped Gloves
BrandKANGSHIELD
Pumping Unit
BrandHENGTAIFENG
Metric System HSS Machine Screwtap M5
BrandSHEFFIELD
4pcs. Pliers Tool Kit
BrandENDURA